“The goal of the technical sto…
“The goal of the technical stop, which will end mid-February, is to prepare the machine for running at 3.5 TeV per beam” #LHC – is.gd/6ZXEl
“The goal of the technical stop, which will end mid-February, is to prepare the machine for running at 3.5 TeV per beam” #LHC – is.gd/6ZXEl